Description
What’s Included
- Site check for proper inverter placement
- Inverter installation with basic wiring and connections
- Connection to existing electrical panel
- Power-on testing
- Basic safety and load checks
What’s Not Included
- Cost or delivery of the inverter
- Panel upgrades or extra wiring work
- Any structural changes for installation
Duration
- Usually completed in 2–4 hours, based on setup and site conditions.


